Mehr Details
Reach Truck (Electrical)
FAIR - Facility for Antiproton and Ion Research in Europe GmbH
Vergabe-Ergebnis
-
Los 1 VergebenReach Truck (Electrical)🏆 Alfred Messner Gabelstapler GmbH · Bremen
- Alfred Messner Gabelstapler GmbH
Lot-Detail aus Schwester-Bekanntmachung auf oeffentlichevergabe.de (gleiche procedure_id).
Beschreibung
The Contractor shall supply a brand-new, operperational, and CE-compliant device and provide training to the operating personnel. The scope of delivery includes all major components required for operation, including the battery and charger, as well as all associated operating manuals and maintenance instructions. To minimize risks associated with operating errors and resulting damage-and ideally to prevent them altogether-the reach truck must be equipped with adequate control and monitoring functions.
Passende Ausschreibungen automatisch erhalten
14 Tage voller Zugang gratis — tägliche Alerts + KI-Eignungsanalyse · keine Kreditkarte · danach kostenfrei weiter
Zuschlagskriterien
Wonach der Auftraggeber das wirtschaftlichste Angebot ermittelt.
-
Price 100 Pkt.Preis
-
Lifting height 0 Pkt.Qualität
The lifting height have to be minimum 9.500 mm
-
Load capacity 0 Pkt.Qualität
The load capacity have to be minimum 1.4 tonnes rated.
-
Delivery date 0 Pkt.Qualität
The delivery of the reach truck have to be completed by December 1st, 2026, at the latest.
Quelle: Bekanntmachung (eForms) — Gewichtung wie vom Auftraggeber veröffentlicht.
Vergabe- & Vertragsbedingungen
Wichtige Bedingungen für Angebot und Ausführung — wie vom Auftraggeber bekannt gemacht.
Hinweise zur Nachprüfung & Rügepflicht
The competent investigating authority is as follows Vergabekammer des Bundes Villemombler Str. 76 D-53123 Bonn, Germany Tel.: 0228 9499-0 Fax: 0228 9499-163 Email: vk@bundeskartellamt.bund.de Web: http://www.bundeskartellamt.de/SharedDocs/Kontaktdaten/DE/Vergabekammern.html The applicant is requested to clearly identify those parts of the request to participate (and any subsequent bid) containing company/business secrets. If this does not happen, the public procurement tribunal will assume consent to inspect the documents as required in the case of carrying out a review procedure (Section 165 (3) Act against Restraints of Competition (Competition Act - GWB)). As the awarding authority, FAIR is required to provide the public procurement tribunal with immediate access to the files when a review procedure is initiated (Section 163 (2) sentence 3 GWB). Applicants/bidders have the right to demand that the Contracting authority comply with the provisions on the award procedure protecting bidders (Section 97 (6) GWB). Applicants/bidders with an interest in the public contract who believe their rights have been violated by non-compliance with the provisions governing the awarding of public contracts, must raise an objection about the violation to FAIR within ten calendar days (Section 160 (3) sentence 1 no. 1 GWB). Violations known from the tender notice or tender documents must be claimed vis-a-vis FAIR before the time limit given for submission of applications (offers) (Section 160 (3) 1 No. 2 - 3 GWB). If FAIR informs the applicant/bidder that it is unwilling to redress the objection, an application for review may then be filed with the public procurement tribunal above within 15 days of receipt of the notification (Section 160 (3) sentence 1 no. 4 GWB). Bidders whose bids are not to be considered for the award of the contract will be notified before the awarding of the contract pursuant to Section 134 GWB. A contract may only be concluded 15 calendar days after FAIR has sent out this information. This period is ten calendar days when transmission is by fax or email. The period commences on the day following the dispatch of the information by FAIR. After this time period has expired, an award is possible even if a time limit pursuant to Section 160 (3) GWB has yet to expire. Therefore, in order to prevent an award, a request for review needs to have been served upon FAIR by the public procurement tribunal before the expiry of the time limit under Section 134 GWB. Pursuant to Section 135 (1) and (2) GWB, the invalidity of an award can only be established if it has been asserted in the review procedure within 30 calendar days from the date on which there was notification on the conclusion of the agreement, though no later than six months after the agreement was concluded. If the Contracting authority published the tender notice in the Official Journal of the European Union, the time limit for claiming ineffectiveness shall expire 30 calendar days after the publication of the tender notice in the Official Journal of the European Union.
Quelle: Bekanntmachung (eForms). Maßgeblich sind die vollständigen Vergabeunterlagen.
Verfahrensverlauf
📅 .icsVollständige Historie dieses Vergabeverfahrens — alle Phasen und Veröffentlichungen.
-
Ausschreibung oev
Angebote werden eingeholt
1 Veröffentlichung
-
Vergabeergebnis Sie sind hier oev
Auftrag wurde zugeschlagen · 25 Tage nach Fristende
Auftragnehmer Alfred Messner Gabelstapler GmbHZuschlagswert 37.100 €1 Veröffentlichung
- 04.08.2026 Original-Veröffentlichung · in TED EU + oev aktuell
Watchlist buchen →Nächste Ausschreibung bei FAIR - Facility for Antiproton and Ion … nicht verpassen?
Auftraggeber-Alert ab 9 €/Mo — tägliche Email sobald etwas ausgeschrieben wird.
Ähnliche Ausschreibungen
📬
Passende Ausschreibungen automatisch finden
14 Tage volle KI-Analyse + tägliche Alerts gratis testen — keine Kreditkarte, danach kostenfrei weiter.
💡 Mehr als wöchentlich? Watchlist ab 9 €/Mo: täglich + Frist-Reminder + Zuschlag-Info →
Personalisiertes Suchprofil einrichten → · Für Einkaufsabteilungen: Rechnung per Überweisung →